Fast, Secure Checkout on Every Order
Secure U.S. Checkout

Valvoline Advanced Full Synthetic 0W-20 Motor Oil – 5 QT

$63.99

In stock and ready to ship

Estimated delivery by
Product details

Description

Help protect your engine with Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil. Formulated for modern gasoline engines, this full synthetic motor oil is designed to provide reliable protection against wear, deposits, heat, and demanding driving conditions.

The 5-quart container provides a convenient quantity for routine oil changes in compatible vehicles requiring SAE 0W-20 motor oil.


✨ Features

🛢️ Full Synthetic Formula

Provides advanced lubrication for modern engines and helps maintain protection across a broad range of operating conditions.

🛡️ Advanced Engine Protection

Helps protect critical engine components against wear during everyday driving and demanding operating conditions.

❄️ 0W-20 Cold-Start Performance

The 0W-20 viscosity grade is designed to flow quickly during cold starts while maintaining appropriate lubrication at normal operating temperatures.

🌡️ Heat Protection

Designed to maintain engine protection under elevated operating temperatures and demanding driving conditions.

🧼 Helps Fight Deposits

Helps control sludge and deposits that can accumulate inside the engine.

Supports cleaner engine operation when used as part of a regular maintenance schedule.

🚗 Designed for Modern Engines

Suitable for compatible gasoline-powered cars, trucks, SUVs, and other vehicles that specify SAE 0W-20 motor oil.

🔄 Everyday & Severe-Service Use

Designed to provide protection during a variety of driving conditions, including routine commuting and more demanding operation.

💪 Helps Reduce Engine Wear

Provides a lubricating barrier between moving engine components to help minimize friction and wear.

📦 Convenient 5-Quart Size

Includes 5 quarts of motor oil, making it convenient for many standard oil changes.

Always check the vehicle's required oil capacity before servicing.

⭐ Valvoline Advanced Full Synthetic

Part of Valvoline's advanced full synthetic motor-oil lineup, designed to provide modern engine protection and dependable lubrication.

📋 Specifications

Product Type: Full Synthetic Motor Oil

Brand: Valvoline

Product Line: Advanced

Viscosity Grade: SAE 0W-20

Container Size: 5 QT

Formula: Full Synthetic

Application: Compatible Gasoline Engines

Primary Benefits: Wear, Heat & Deposit Protection

Recommended Use: Vehicles Requiring 0W-20 Motor Oil

⚠️ Compatibility Note

Always check your owner's manual before selecting motor oil. Confirm both the required SAE viscosity and applicable API/OEM performance specification for your specific vehicle. Do not select oil based solely on viscosity.

⭐ Why You'll Love It

✅ 🛢️ Full Synthetic Formula

✅ 🛡️ Advanced Engine Protection

✅ ❄️ Excellent Cold-Start Flow

✅ 🌡️ Helps Protect Against Heat

✅ 🧼 Helps Control Deposits

✅ 🚗 Designed for Modern Engines

✅ 💪 Helps Reduce Engine Wear

✅ 🔄 Great for Everyday Driving

✅ 📦 Convenient 5-Quart Container

✅ ⭐ Valvoline Advanced Formula

Shipping & returns

Shipping rates and estimated delivery times are shown at checkout. Returns follow your store policies.

Need help?

Contact our support team through the contact page or live chat.

Recently viewed